Engineering Change Management in the Engineer-to-Order Production Environment: Insights from Two Case Studies - Inria - Institut national de recherche en sciences et technologies du numérique
Communication Dans Un Congrès Année : 2018

Engineering Change Management in the Engineer-to-Order Production Environment: Insights from Two Case Studies

Résumé

Engineering changes (ECs) are part of any Engineer-to-order (ETO) project. The engineering change management (ECM) literature provides various tools, methods and best practices, and this study investigates ECM practices in the ETO production environment. Through two exploratory case studies, we identify five main ECM challenges; EC impact analysis, EC data management, internal and external collaboration and communication, and EC post-implementation review. Both companies have implemented the main ECM steps recommended in literature but there are considerable weaknesses in the execution of the post-implementation review process. More ETO cases are needed to confirm the findings and investigate how ECM tools and approaches vary by different dimensions.
Fichier principal
Vignette du fichier
472850_1_En_17_Chapter.pdf (212.16 Ko) Télécharger le fichier
Origine Fichiers produits par l'(les) auteur(s)
Loading...

Dates et versions

hal-02164862 , version 1 (25-06-2019)

Licence

Identifiants

Citer

Natalia Iakymenko, Anita Romsdal, Marco Semini, Jan Ola Strandhagen. Engineering Change Management in the Engineer-to-Order Production Environment: Insights from Two Case Studies. IFIP International Conference on Advances in Production Management Systems (APMS), Aug 2018, Seoul, South Korea. pp.131-138, ⟨10.1007/978-3-319-99704-9_17⟩. ⟨hal-02164862⟩
84 Consultations
162 Téléchargements

Altmetric

Partager

More