Incorporating Regularity of Required Workload to the MMSP-W with Serial Workstations and Free Interruption of the Operations - Inria - Institut national de recherche en sciences et technologies du numérique Accéder directement au contenu
Communication Dans Un Congrès Année : 2013

Incorporating Regularity of Required Workload to the MMSP-W with Serial Workstations and Free Interruption of the Operations

Résumé

We propose a mathematical model to solve an extension to the mixed-model sequencing problem with work overload minimization (MMSP-W) for production lines with serial workstations and parallel homogeneous processors and regularizing the required workload. We performed a computational experience with a case study of the Nissan engine plant in Barcelona.
Fichier principal
Vignette du fichier
978-3-642-40352-1_51_Chapter.pdf (1.97 Mo) Télécharger le fichier
Origine : Fichiers produits par l'(les) auteur(s)

Dates et versions

hal-01472270 , version 1 (20-02-2017)

Licence

Paternité

Identifiants

Citer

Joaquín Bautista, Rocío Alfaro, Alberto Cano. Incorporating Regularity of Required Workload to the MMSP-W with Serial Workstations and Free Interruption of the Operations. 19th Advances in Production Management Systems (APMS), Sep 2012, Rhodes, Greece. pp.405-412, ⟨10.1007/978-3-642-40352-1_51⟩. ⟨hal-01472270⟩
47 Consultations
86 Téléchargements

Altmetric

Partager

Gmail Facebook X LinkedIn More