Integrated Mixed-Model Assembly Line Balancing with Unskilled Temporary Workers - Inria - Institut national de recherche en sciences et technologies du numérique Accéder directement au contenu
Communication Dans Un Congrès Année : 2015

Integrated Mixed-Model Assembly Line Balancing with Unskilled Temporary Workers

Résumé

This study extends a single-model assembly line balancing problem to an integrated mixed-model assembly line balancing problem by incorporating unskilled temporary workers, who enhance productivity. An integer program that minimizes the sum of total workstation costs and salaries of skilled permanent and unskilled temporary workers within a specific cycle time is developed. The proposed models is based on particular features of a real-world problem including simultaneous assignments of skilled permanent and unskilled temporary workers as well as precedence restrictions for the tasks.
Fichier principal
Vignette du fichier
346973_1_En_38_Chapter.pdf (343.05 Ko) Télécharger le fichier
Origine : Fichiers produits par l'(les) auteur(s)
Loading...

Dates et versions

hal-01431112 , version 1 (10-01-2017)

Licence

Paternité

Identifiants

Citer

Dongwook Kim, Jinwoo Park, Ilkyeong Moon. Integrated Mixed-Model Assembly Line Balancing with Unskilled Temporary Workers. IFIP International Conference on Advances in Production Management Systems (APMS), Sep 2015, Tokyo, Japan. pp.324-331, ⟨10.1007/978-3-319-22759-7_38⟩. ⟨hal-01431112⟩
66 Consultations
206 Téléchargements

Altmetric

Partager

Gmail Facebook X LinkedIn More