Filter your results
- 6
- 2
- 8
- 4
- 2
- 1
- 1
- 8
- 8
- 8
- 8
- 8
- 8
- 8
- 8
- 8
- 8
- 8
- 8
- 8
- 6
- 6
- 6
- 6
- 6
- 8
- 8
- 2
- 1
- 2
- 3
|
|
sorted by
|
Genetic Algorithms for the Flow Shop Scheduling Problem with availability constraintsIEEE International Conference on Systems, Man, and Cybernetics 2001, 2001, Tucson, Arizona
Conference papers
inria-00100516v1
|
|||
Minimizing the Makespan for the Flow Shop Scheduling Problem with Availability ConstraintsOperational Research Peripatetic Post-Graduate Programme - ORP3, Sep 2001, Paris, France
Conference papers
inria-00100517v1
|
|||
Flow Shop Scheduling Problem with Limited Machine Availability: A Heuristic ApproachInternational Journal of Production Economics, 2004, 26 p
Journal articles
inria-00100097v1
|
|||
A heuristic approach for the job shop scheduling problem with availability constraintsXV Conference of the European Chapter on Combinatorial Optimization - ECCO'2002, ECCO, May 2002, Lugano, Switzerland, 1 p
Conference papers
inria-00100961v1
|
|||
Permutation Schedules Are Good For Realistic Flow ShopInternational Conference on Industrial Engineering and Production Management - IEPM'2001, CENTOR, Université Laval Québec (Can) et CREGI, Facultés Universitaires Catholiques de Mons (B), 2001, Quebec, Canada, pp.1147-1155
Conference papers
inria-00100515v1
|
|||
Minimizing the Makespan for the Flow Shop Scheduling Problem with Availability ConstraintsEuropean Journal of Operational Research, 2004, 153 (3), pp.534-543
Journal articles
inria-00099940v1
|
|||
A New Heuristic for the Flow Shop Scheduling Problem with Availability ConstraintsInternational Symposium on Combinatorial Optimization - CO'02, Apr 2002, Paris, France, 1 p
Conference papers
inria-00100962v1
|
|||
Flow Shop Scheduling Problem with Limited Machine Availability: A Heuristic ApproachInternational Conference on Industrial Engineering and Production Management - IEPM'2003, Fucam, May 2003, Porto, Portugal, pp.140-149
Conference papers
inria-00099826v1
|