Supply management in assembly systems : the basic problem - Inria - Institut national de recherche en sciences et technologies du numérique Accéder directement au contenu
Rapport (Rapport De Recherche) Année : 1992

Supply management in assembly systems : the basic problem

Résumé

We consider the case when n components are needed to assemble a given product. Components are provided by suppliers and the period between the order time and the time a component is available (i.e. the yield from supplier) is the value taken by a random variable with a known distribution. The due date for the assembled product is also known. The cost to be taken into account are the inventory cost of the components and the backlogging cost of the assembled product. We propose an iterative algorithm which leads to the optimal order instants of the components.

Domaines

Autre [cs.OH]
Fichier principal
Vignette du fichier
RR-1624.pdf (513.44 Ko) Télécharger le fichier

Dates et versions

inria-00074937 , version 1 (24-05-2006)

Identifiants

  • HAL Id : inria-00074937 , version 1

Citer

Chengbin Chu, Jean-Marie Proth, Xiaolan Xie. Supply management in assembly systems : the basic problem. [Research Report] RR-1624, INRIA. 1992, pp.16. ⟨inria-00074937⟩
77 Consultations
26 Téléchargements

Partager

Gmail Facebook X LinkedIn More